Run the tip of the flame along the intersection of the roofing roll and the sheathing.
Torch roofing felt installation.
Once the layers reach the right temperature seams are melted together to create a waterproof seal.
Choose heat resistant gloves and boots made of a material like kevlar.
Ensure your flat roof is entirely clear of debris.
Insulation is especially important in colder climates but it s an essential part of any.
Fasten drip edge on eaves with.
How to install torch down modified bitumen roofing.
Install heavy roofing felt with overtop.
The idea is to lightly melt both the roofing and the felt.
Installing the roofing felt does take care but can go very quickly.
Installing the torch down roofing involves flames and melted asphalt.
As such whether it s carrying heavy equipment from the truck clearing the entryway to the roof or just offering them water on a hot day always help out the contractor as much as possible.
Torch down roof application step 1.
Nail metal drip edge flashing which bends over the roof and down the edge of the facing board on all roof edges.
Thank you for watching this video.
These thick layers of roofing felt are installed by heating the back of the felt with a butane torch and then carefully applying it to the roof.
On top of the insulation your roofing contractor will lay down a vapor barrier.
Installing roof felt is a two person job.
Follow us on social media.
How to torch a roof.
The less time your pro spends on your project the cheaper the final bill will be.
Taking the time to properly prepare the sheathing will make all the difference in how quickly and easily the felt paper is installed.
Torch down roofing installation while dangerous is labor intensive.
In this installation method sheets of modified bitumen are rolled out onto the roof and a roofing professional uses a hand held propane torch to heat the material and adhere it to the surface.
Also cover up with long sleeved clothing to reduce the chances of an accident.
If you liked this video please like and subscribe for more roofing content.
Lay down a moisture barrier.
Once you see heat bubbles along the roll s width use your foot to gently roll the roofing forward.