Prepare for installation of fascia panel by apply ing undersill trim along the top of the fascia board.
Vinyl fascia installation.
Vinyl soffit and fascia has become one of the most often used products for exterior trim.
Determine the preferred method of installing soffit at the fascia board.
Install the panel by hooking the bottom of the fascia panel under the f channel and pushing the top into the undersill trim or drip edge showninillus 4.
For gables vinyl fascia installs the same way but you will slip the vinyl strip under the metal roof edge instead of the gutter apron.
It has practically replaced aluminum in new construction and home remodeling.
When installing j channel at either wall of fascia board nail every 8 to 12 203mm to 305mm.
Expect the vinyl fascia prices to fluctuate between various companies each and every company have different operation expenses and over head.
This video covers installing the fascia and proper nailing.
Vinyl fascia pricing and installation cost checklist.
Get at least 3 5 estimates before hiring a vinyl fascia contractor estimates are typically free unless it s a service call for a repair.
Fascia board is the flat horizontal board along the edge of a roof.
Follow steps 3 4 5 above to complete installation.
Before you begin installing vinyl soffit and fascia be sure to do the following.
Soffit installations over open eaves 1 install receiving channels f receiver or j channel.
Certainteed installation guide for vinyl carpentry soffit fascia.
Cut the bottom end of the fascia level with the bottom edge of the roof.
Nail down any loose boards panels shingles or tiles.
These items are easy to install and easy to replace if needed and will protect exposed wood from water damage for years.
And vinyl fascia install a frieze back plate f channel on the bottom of fascia board and the complete soffit installation fig.
Read the instructions that come with the soffit and fascia.
Check that the undersides of the eaves are straight and even source.
If the soffit is to turn a corner cut and install j channel to allow 1 4 6 4mm for expansion at each of the adjoining walls and fascia boards.